On Thu, 27 Dec 2001, Clint Wolff (VAX collector) wrote:
On the other hand (and to bring us slightly closer to
topic), I got my
200Amp load center installed and wired up. Now I just need to get an
inspection (ummmm.... Yup, thats a load center.... Your wire is the
improper shade of red, you'll have to replace it all...), and get PSCo
out to hook the feed wire up. Then I'll have an extra 80Amps to run
VAXEN!!!!!!
I spent part of the day gathering up the remaining bits of EMT conduit and
boxes for my new building's electrical systems. Only stuff left for me to
buy is NMT conduit/boxes/fittings for network and low voltage wiring.
Eventually I'll have a finished building and a 100A branch where my boxes
can live.