Nearly broke my
back when carrying it
up the stairs.
Pull the power supplies and disk cages next time.
No thanks, I consider it "work-out". Could be a part of classiccmp-olympics:
1) H50 up-the-stairs-and-back (also possible as a relay event)
2) downhill racing inside full-size rack cabinets
3) Fix the PDP relay-event (again). Each team member gets two minutes,
one (1) leaflet of the schematics and one (1) tool. Dropping the
screwdriver on fully loaded UNIBUS power distribution tracks leads
to disqualification.
I'll shut up now.
--
jht