And, could the "mainframe" actually cost
that much?? Switches:
22@$5=$110. PS=$50. Backplane=$75. Sheetmetal=$250. FP=$100. Maybe I have a
warped idea of what this stuff costs, but I was expecting a lower number.
Multiply the above numbers by a factors of 1.5 or so, and you're about
in the right ballpark (though the real factor is much closer to 4 for
the power supply - $50 won't buy anything but a way-too-dinky transformer.)
I did a similar calculation when deciding whether I could sell my "TIMSAI"
as a commercial product, and came up with a street price for it (with
very similar production costs) that would have to be close to $2000-$3000 to
justify the effort.
--
Tim Shoppa Email: shoppa(a)trailing-edge.com
Trailing Edge Technology WWW:
http://www.trailing-edge.com/
7328 Bradley Blvd Voice: 301-767-5917
Bethesda, MD, USA 20817 Fax: 301-767-5927