Greetings folks:
Bob Shannon has a PDP-11/34 rack system for me in Massachusetts sitting in
his garage. I can take care of having it shipped from any location that has
a loading dock, so the shipping isn't a problem as long as it is shipped
sometime within the next week or two at most. However, the shipper will want
it banded to a pallet and shrinkwrapped and Bob doesn't have the stuff to do
that, nor does he have a loading dock.
Is there anyone who might be able to assist getting the system banded to a
pallet and shrinkwrapped, and possibly to a loading dock that the shipper
will pick up from? Any thoughts or assistance is greatly appreciated.
Thanks!
Jay West
Show replies by date