On 8/15/14 3:42 PM, Chuck Guzis wrote:
Over $200? Holy cow--my big expense was for the PID
controller and some 73C thermal safety fuses.
Whatever.. CHM has no shop, no supplies, and a few tools that either I or the maint guys
have.
I also had to pay for it.
It was worth it to me to not have to build it. All I had to do was stuff the PID
controller thermocouple
inside the chamber so I could get an accurate temperature reading.