On 06/18/2014 02:35 PM, Guy Sotomayor wrote:
I just did this for my shop. Pictures are here:
http://www.shiresoft.com/new-shop/Shiresoft/New_Shop.html.
I upgraded the power from 40A 220v to 200A 220v. I also put in a two stage AC rated at
55,000BTU at
high speed and about 2/3 of that on low speed. I spent the extra $'s so that the AC
wouldn't "short cycle"
when I'm not running big loads (which will probably be most of the time).
Probably a US-EU difference, but standard residential distribution in
the US tends to be 200A 240V. Some of my neighbors have 400A service to
their homes.
--Chuck