On Tue, 16 Oct 2007 09:06:32 -0700
"Chuck Guzis" <cclist at sydex.com> wrote:
Some older equipment required a 3-phase 400Hz
supply (i.e. get your
MG set running).
Once I saw the MG of a CDC Cyber 960 starting. It needed about
one
minute to get up to speed. It sucked 400 V @ 120 A three phsase during
startup.
That's the sort of thing worthy of video. Big power control stuff is fun :)
Was that rating for the entire system, or just the CPU & I/O (no drives etc.)?