----- Original Message -----
From: "Vincent Slyngstad" <vrs at msn.com>
To: "General Discussion: On-Topic and Off-Topic Posts"
<cctalk at classiccmp.org>
Sent: Sunday, March 23, 2014 6:21 AM
Subject: Re: No more bus driver discussion, PLEASE!
From: Vincent Slyngstad: Saturday, March 22, 2014 6:02
PM
Apparently Omnibus systems with more than 2 boxes
were not
guaranteed to work. I'm not sure what lengths the BC80C cable
assembly came in.
Found it. A BC80C cable is apparently about 6 feet from edge
connector to edge connector, with about 4 feet of flexprint
between the paddle cards.
http://bitsavers.trailing-edge.com/pdf/dec/pdp8/pdp8a/MP00140_BA8-C_Unit_As…
(page 56 of 60)
So the total length of an Omnibus wasn't supposed to be terribly
long.
Vince
Apparently the requirement for expansion of the omnibus via cable was a
rather late extra, well after the basic spec had been set and the design
done, it mainly involved a rework of the bus loads.
see tale 14 of this very interesting artical by one of the main PDP8E
design engineeres.
http://www.ieeeghn.org/wiki/index.php/First-Hand:PDP-8/E_OMNIBUS_Ride
Dave H
-----
No virus found in this message.
Checked by AVG -
www.avg.com
Version: 2012.0.2247 / Virus Database: 3722/6731 - Release Date: 03/22/14